New production line of Filler in Moha

Realization of the set of form and ironframework drawings of the new line Filler in Moha

Voir projet

Second manufacture unit of the train wheels

Thanks to the success of the first project (2002/2003), the Valdunes Belux company assigned us the complete management of the installation of the second manufacture line, included the laying out of a part of the workshop, function of the new flows and introduction in the line of 2 additional controle machine.

At the end of this project, the company realized to triple its productivity and to keep its 2002 employement rate.

Voir projet

St Vith bridge

Implementation of a demolition process of a superior way after the verification of the stability for each step of the demolition.

Voir projet