Combustibles FM2 and FR3

New providing unit in combustible furnace Maerz 2 and rotary furnace 3 in Carmeuse Moha Nouvelle unité d'alimentation en combustibles four Maerz 2 & four rotatif 3 in Carmeuse, Moha - Belgium

Realization of the drawings for the set and details.

  • 3D
  • Build licence
  • Form drawings
  • iron framework drawing
  • Purchase contract
  • Frame drawing
  • Phasing drawing
  • Tracing
  • Location and assembly drawing
Voir projet

New crushing line

New crushing line for Carmeuse - Wanze, Belgium

In order to increase its production capacity, the Carmeuse Company, specialized in the extraction and transformation of the limestone en dolomite into lime and essential by-products, has decided to install a new crushing line. This new installation is composed of a primary unit, a secondary building and a warehousing, all linked with a transport line.

The primary unit is composed of the main entrance hopper and a crusher whereas the secondary building is composed of screens, crusher, ... which allow to wash and screen the product. The instant capacity of this new ligne is 800 T/h

Voir projet

Alternative combustible Furnace Maerz 5

New unit for the providing of combustible for the furnace Maerz 5Nouvelle unité d'alimentation en combustibles du Four Maerz 5

Voir projet

New production line of Filler in Moha

Realization of the set of form and ironframework drawings of the new line Filler in Moha

Voir projet

Quick links

Contact

  • EBC Sprl
  • Grand route, 80
  • 4367 Crisnee
  • Belgium