Combustibles FM2 and FR3

New providing unit in combustible furnace Maerz 2 and rotary furnace 3 in Carmeuse Moha Nouvelle unité d'alimentation en combustibles four Maerz 2 & four rotatif 3 in Carmeuse, Moha - Belgium

Realization of the drawings for the set and details.

  • 3D
  • Build licence
  • Form drawings
  • iron framework drawing
  • Purchase contract
  • Frame drawing
  • Phasing drawing
  • Tracing
  • Location and assembly drawing
Voir projet

New crushing line

New crushing line for Carmeuse - Wanze, Belgium

In order to increase its production capacity, the Carmeuse Company, specialized in the extraction and transformation of the limestone en dolomite into lime and essential by-products, has decided to install a new crushing line. This new installation is composed of a primary unit, a secondary building and a warehousing, all linked with a transport line.

The primary unit is composed of the main entrance hopper and a crusher whereas the secondary building is composed of screens, crusher, ... which allow to wash and screen the product. The instant capacity of this new ligne is 800 T/h

Voir projet

Revamping of the installation of Hydrosulfite

Revamping of the hydrosulfite production factory : réalization of the complete study : drawing of the factory in 3 dimensions, equipment establishements, sizing of the new structure and realization of the set drawings and details included all the driving alimentation and exit part.

Voir projet

Methanol place

Adaptation of the methanol place with incorporation of a new distillation column.

Voir projet

Quick links

Contact

  • EBC Sprl
  • Grand route, 80
  • 4367 Crisnee
  • Belgium